I’ve been with Virgin for over 20 years and I’ve been desperate to leave them for most of that time but there have been no other options for full fibre internet. In the last few weeks contractors for Openreach have been digging up the pavements in my area laying ducting (I think?) which got me pretty excited and the possibility of having an alternative to Virgin. I got an email from Openreach this morning saying they’ve added my address to their build plans and they will keep me updated but after checking their website it says my build will take place between now and December 2026 which was a bit gutting.
I’m just wondering if the fact they’ve been digging up roads and pavement outside my house means I might get connected sooner rather than later or does it not really work that way?
Thanks